Friday 9 April 2021

On Display Indefinitely

School Holiday Program

Maryborough Regional Library

Week Two

Maryborough Regional Library is hosting ventriloquist Chris Elkington on Thursday 15 April at the Maryborough Senior Citizens Hall at 11am and at 1.30pm at the Dunolly Senior Citizens Hall.

Bookings are essential and can be made on 5461 9111.

Central Goldfields Art Gallery

The Central Goldfields Art Gallery is hosting a weaving program with Multi Clan artist Aunty Marilyne Nicholls on Thursday 14 April at the Tren du Bourg Hall, corner of Neill and Campbell streets.

There will be two sessions – 10.30am to 12.30pm and 2.30pm to 4.30pm. Admission is $5 per session.

Aunty Marilyne Nicholls will teach participants how to weave using fibres. The individual weavings will then be woven together to make one art piece.

This workshop is for children aged 10 to 18 and bookings are essential. To book, call the gallery on 5461 6600.

Gordon Gardens Master Plan project

In September, 2019 Council adopted the Gordon Gardens Master Plan.

A number of projects that were identified as part of the Gordon Gardens Master Plan were constructed at the precinct during 2019/2020 including a basketball court, bicycle/scooter pump track, outdoor fitness equipment/ shade structure and a touch-free water fountain.

The next stage of the Master Plan work will commence in April, 2021 and includes:

  • Development of the vacant block beside the Senior Citizens building into a carpark, including two disabled parking spots
  • Extension of the ramps into the Senior Citizens building
  • Walking path from the carpark to the Queen Victoria Jubilee Monument within Gordon Gardens
  • New path and new pedestrian gate into the Bowls Club from the carpark
  • New sliding gate at the Bowls Club to allow access to the Bowls Club sheds
  • Relocation of the Bowls Club’s water tanks

The works will be delivered by Council’s Operations team and will begin later this month. The project will take approximately four weeks to complete.

More information, including a copy of the Gordon Gardens Master Plan, is available to view at www.centralgoldfields.vic.gov.au/gordongardens

IT Traineeship opportunity

Do you know a young person interested in an IT career?

We have a traineeship available within our Information Technology team.

The role is part of the Victorian Apprenticeship Recovery program, and therefore to be eligible to apply, you must be under 24 years of age with no prior tertiary qualifications.

To find out more visit www.centralgoldfields.vic.gov.au/currentvacancies

New outdoor dining spaces installed

New outdoor dining spaces were installed in Dunolly prior to Easter with three more to be added to the Maryborough CBD this week.

Installed by our Operations team, the temporary parklets have been made possible with funding from the State Government’s Outdoor Eating and Entertainment Package aimed at supporting the hospitality industry to rebuild from the economic and social impacts of the pandemic.

They follow the installation of a parklet outside the Daily Dose Café in High Street Maryborough in February.

A parklet is an extension of the footpath that allows additional space for pedestrians or businesses to use the street.

Council’s Economic Development team is liaising with other local food and drink businesses interested in parklets and footpath dining. Funding is available for a limited time.

Local businesses interested in getting involved can contact Council’s Economic Development Officer Brian Gould on 0419 762 793.

Animal registrations

A reminder to pet owners that animal registrations are due by 10 April.

If you own a dog or cat, you can register or renew your registration at www.centralgoldfields.vic.gov.au/registeryourpet

Derby Road enhancement project

We’re planning to beautify the medium strip along Derby Road, Maryborough – between Lean Street (Goldfields Reservoir) and Carramar Nursery.

As one of Maryborough’s main entry points, the project will make this precinct more visually pleasing to visitors and complement the medium streets located at the High Street end of Derby Road.

The project involves the planting of 30 Japanese Elm trees, with Tuscan stone filling the space between the trees. Irrigation will also be installed as part of the project.

The project, funded as part of the Council’s 2020/21 Budget, will take around two weeks to complete and is expected to be carried out in May.

Residents wanting more information about the project can visit www.centralgoldfields.vic.gov.au/haveyoursay or contact Council’s Manager Operations Amber Robinson on 5461 6702 or email amber.robinson@cgoldshire.vic.gov.au

Road works

Road re-construction works on Gillies Street (between Majorca Road and Fuller Street) and Rogers Street (between Gillies Street and Railway Street) in Maryborough have commenced.

The project includes drainage, kerb and channel works and road pavement construction.

Both sections of road will be closed to all through traffic for the duration of the works, and detours and road closures will be in place.

The project will be undertaken by Doran Earthmoving and is expected to take approximately 10 weeks to complete.

The project has been funded by Council and the Federal Government’s Roads to Recovery program.

Tenders 

Tenders currently available through Central Goldfields Shire Council are listed below.

Tender documents can be downloaded from e-Procure, accessible via Council's website www.centralgoldfields.vic.gov.au/tenders

Tender No.  Description Closes
G1478-21 Condition Assessment of Council Buildings

12noon

14/04/2021

G1481-21 Municipal Health and Wellbeing Plan

12noon

28/04/2021